KNOWLEDGE ADDA
A generating station has a maximum demand of 500 MW. The annual load factor is 50 percent. The energy generated per annum will be:
A) 2.19 x 106 MWhr
B) 600 MWhr
C) 250 MWhr
D) 7.50 x 106 MWhr
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment